More pictures of our Christmas present in progress...
Day 3 - November 18th, 2007
|
|
|
The front wall with a coat of paint. |
The hallway wall with a coat of paint. |
|
|
The kitchen wall with a coat of paint. |
Tyler working his way up the scaffolding. |
|
|
Tyler almost at the top with Grandpa. |
Tyler and Grandpa standing on the scaffolding. |
Day 4 - November 19th, 2007
|
|
|
Tyler had his turn yesterday, so today it was Samantha's turn to
climb up with Grandpa. Mom didn't turn on the flash, so I apologize for
the blurry pictures. |
Day 5 - November 20th, 2007
|
|
|
The back door area all finished. |
The hallway wall and ceiling all finished. |
|
|
The front wall and kitchen wall intersection. |
The front wall near the doorway after it was completed. |
|
The hallway all finished. |
Finished Product - November 20th, 2007
|
|
|
The hallway wall. |
The front wall. |
|
|
The entry area. |
The kids picture area (minus Jayden's, which should be coming in a
couple of months). |
|
|
The back door wall. |
Another picture of the hallway wall. |
|